INFRADAY PROJECTS
Panhandle Solar
Texas County, Oklahoma · Renewable energy
Source research checked: Not recorded
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Panhandle Solar, LLC
- Delivery method
- Not verified
- Expected completion
- December 2026 (EIA-reported planned unit operation in the September 2026 inventory; subject to change)
Overview
EIA's September 2026 inventory reports 102 MW solar photovoltaic in planned units at Panhandle Solar, Texas County, Oklahoma.
Technical scope
EIA plant IDs: 69969. Planned units are grouped as one project; existing operating units are outside this scope.
Plant 69969, generator PAS: Solar Photovoltaic; nameplate 102 MW; net summer 102 MW; net winter 102 MW; planned operation December 2026; (U) Under construction, less than or equal to 50 percent complete.
- Project type
- Solar Photovoltaic
Contacts
Project contact research is not yet verified. Use the official agency contact route while research is completed.
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
- Recorded organizations
- EIA reporting entities: Panhandle Solar, LLC; balancing authority code(s): SWPP
Specific roles and award relationships remain subject to source verification.
Budget & Funding
Project cost and funding have not yet been verified.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded completion
- December 2026 (EIA-reported planned unit operation in the September 2026 inventory; subject to change)
Documents & Resources
- EIA September 2026 Preliminary Monthly Electric Generator Inventory, Planned worksheet ↗Released 2026-10-23; reviewed 2026-11-08Plant IDs 69969; worksheet rows 486; reporting entity, location, capacity, unit status and planned operation
- EIA release and methodology ↗Released 2026-10-23Preliminary data and scope
Updates & Intelligence
Earlier recorded updates
2026-11-08: Newly indexed from EIA. Status and dates reflect the September 2026 preliminary inventory, released October 23, 2026. The project stage reflects the most advanced reported unit. Capacities are preliminary and are separated by technology; generation and battery ratings must not be treated as simultaneous site export capacity. EIA reporting entities are not independently verified ultimate owners. Project costs, contractors and procurement are not established by this dataset.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.