Panama City Beach Multimodal Vision Zero Safety Program
Panama City Beach, Florida · Transportation, Highways and bridges
Source research checked: Not recorded
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Panama City Beach
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
USDOT selected Panama City Beach for a $3,333,289 FY 2026 SS4A implementation grant. The project will implement pedestrian crossing safety improvements on Front Beach Road and Thomas Drive, supported by supplemental planning activities and demonstration activities.
Technical scope
The project will implement pedestrian crossing safety improvements on Front Beach Road and Thomas Drive, supported by supplemental planning activities and demonstration activities. The implementation work includes 7 enhanced midblock crossings along 8.5 miles of Front Beach Road, with rectangular rapid-flashing beacons, pedestrian refuge islands, high-visibility crosswalks, upgraded signage, pavement markings, pedestrian-scale lighting, and signal timing adjustments where applicable. Between 2021 and 2025, Panama City Beach recorded 5,679 crashes, including 23 fatalities and 112 serious injuries, and 63% of killed or seriously injured crashes involved vulnerable road users. Across the 7 project segments, there were about 450 crashes between 2020 and 2025. The project applies FHWA Proven Safety Countermeasures to address nighttime visibility, unsafe midblock crossings, and severe pedestrian crash risk on high-injury network corridors. The City reports the project is 100% designed and ready for construction, with expected safety benefits including reduced pedestrian-involved crashes and improved driver yielding. This project includes Planning and Demonstration funds to develop a citywide Action Plan, complete a roadway lighting study, and deploy pedestrian safety demonstration activities at up to 5 intersections. These supplemental planning activities will refine crash analysis, identify priority locations, and test treatments such as curb extensions, high-visibility crosswalks, and signal operational enhancements.
- Project type
- Road safety infrastructure
Contacts
Project contact research is not yet verified. Use the official agency contact route while research is completed.
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
- Recorded organizations
- Lead applicant: Panama City Beach; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Reported project value
- $4,761,841 total project cost in the FY 2026 award record; award-time scope and estimate.
- Recorded funding
- $3,333,289 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- 2026-10-30: FY 2026 SS4A award announced.
Documents & Resources
- USDOT FY 2026 SS4A full award list ↗2026-10-30Applicant, project scope, state, grant type, federal award and total project cost
- USDOT FY26 SS4A award workbook ↗2026-10-30Project: Panama City Beach Multimodal Vision Zero Safety Program; applicant: Panama City Beach
Updates & Intelligence
Earlier recorded updates
2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.