← Infraday Projects

INFRADAY PROJECTS

Murfreesboro Safe Streets – City of Murfreesboro

City of Murfreesboro, Tennessee · Transportation, Highways and bridges

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$10,353,685 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
City of Murfreesboro
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected City of Murfreesboro for a $8,282,947 FY 2026 SS4A implementation grant. The project will implement 6 projects from its adopted Action Plan on the high-injury network, including traffic signal upgrades, traffic calming on 2.8 miles of Saint Andrews Drive, a pedestrian hybrid beacon at Veterans Parkway near Barfield Crescent Park, a safety public outreach campaign, a pavement management plan, and post-crash care blood supply improvements for the fire department.

Technical scope

The project will implement 6 projects from its adopted Action Plan on the high-injury network, including traffic signal upgrades, traffic calming on 2.8 miles of Saint Andrews Drive, a pedestrian hybrid beacon at Veterans Parkway near Barfield Crescent Park, a safety public outreach campaign, a pavement management plan, and post-crash care blood supply improvements for the fire department. Between 2020 and 2024, Murfreesboro recorded 26,023 crashes, including 38 fatal crashes and 331 serious injury crashes, and the 80 signalized intersections on selected high-injury network corridors accounted for 5,582 crashes, including 9 fatal crashes and 65 serious injury crashes. Infrastructure work includes flashing yellow arrows, retroreflective backplates, upgraded lighting and detection, pedestrian crossing and accessibility improvements, and corridor-wide speed management measures that align with Federal Highway Administration Proven Safety Countermeasures. The project is intended to reduce KSI crashes through a Safe System Approach that combines safer roads, safer people, and stronger post-crash care. This project includes Planning and Demonstration funds to implement a near-miss demonstration project at 4 signalized intersections on high-injury network corridors near Middle Tennessee State University. Camera-based systems will monitor vehicle and pedestrian conflicts, establish safety thresholds, and alert staff so the City can make operational changes and deploy low-cost countermeasures before severe crashes occur. Supplemental Planning activities include the development of a Pavement Management Plan to incorporate safety into future pavement maintenance projects.

Project type
Road safety infrastructure

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: City of Murfreesboro; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$10,353,685 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$8,282,947 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.