← Infraday Projects

INFRADAY PROJECTS

Modernizing Maine’s Southern Gateway: Route 1 Safety and Accessibility Project

Town of Kittery, Maine · Transportation, Highways and bridges

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$13,436,000 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Town of Kittery
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected Town of Kittery for a $10,748,800 FY 2026 SS4A implementation grant. The project will implement safety improvements along nearly 1 mile of U.S.

Technical scope

The project will implement safety improvements along nearly 1 mile of U.S. Route 1 between Haley Road and Ox Point Drive. The project addresses a high-injury network corridor with 154 crashes between 2020 and 2024, including 3 fatal or serious injury crashes, and recurring rear-end, sideswipe, and intersection movement crash patterns. Improvements include sidewalks and a shared-use path, marked crosswalks with accessible pedestrian signals, a new traffic signal at Kittery Trading Post and Cottage Way, a protected left-turn phase at Haley Road, medians, pedestrian refuge islands, rectangular rapid-flashing beacons, lighting, lane-width reductions, center turn lanes, access management, and roundabouts. These treatments align with the Safe System Approach and FHWA Proven Safety Countermeasures to reduce conflict points, manage speeds, and improve conditions for people walking and driving. The project is identified in the Kittery Area Comprehensive Transportation System Regional Safety Action Plan and is intended to reduce killed or seriously injured crashes while improving corridor safety and reliability.

Project type
Road safety infrastructure

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: Town of Kittery; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$13,436,000 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$10,748,800 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.