- Expected completion
- September 2027 (EIA-reported planned unit operation in the September 2026 inventory; subject to change)
Overview
EIA's September 2026 inventory reports 310 MW solar photovoltaic in planned units at Milford Solar Phase II, Beaver County, Utah.
Technical scope
EIA plant IDs: 69930. Planned units are grouped as one project; existing operating units are outside this scope.
Plant 69930, generator MS2: Solar Photovoltaic; nameplate 310 MW; net summer 310 MW; net winter 310 MW; planned operation September 2027; (U) Under construction, less than or equal to 50 percent complete.
- Project type
- Solar Photovoltaic
Contacts
Project contact research is not yet verified. Use the official agency contact route while research is completed.
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
- Recorded organizations
- EIA reporting entities: Milford Solar Phase II, LLC; balancing authority code(s): LDWP
Specific roles and award relationships remain subject to source verification.
Budget & Funding
Project cost and funding have not yet been verified.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded completion
- September 2027 (EIA-reported planned unit operation in the September 2026 inventory; subject to change)
Documents & Resources
- EIA September 2026 Preliminary Monthly Electric Generator Inventory, Planned worksheet ↗Released 2026-10-23; reviewed 2026-11-08Plant IDs 69930; worksheet rows 1020; reporting entity, location, capacity, unit status and planned operation
- EIA release and methodology ↗Released 2026-10-23Preliminary data and scope
Updates & Intelligence
Earlier recorded updates
2026-11-08: Newly indexed from EIA. Status and dates reflect the September 2026 preliminary inventory, released October 23, 2026. The project stage reflects the most advanced reported unit. Capacities are preliminary and are separated by technology; generation and battery ratings must not be treated as simultaneous site export capacity. EIA reporting entities are not independently verified ultimate owners. Project costs, contractors and procurement are not established by this dataset.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.