Liberty Park Land Bridge – Reconnecting East Central Spokane
Spokane County, Washington · Transportation, Highways and bridges
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
Develop a land bridge and trail connections across I-90 to reconnect East Central Spokane with Liberty Park and the wider nonmotorized transportation network.
Technical scope
Develop a land bridge and trail connections across I-90 to reconnect East Central Spokane with Liberty Park and the wider nonmotorized transportation network.
Agency-published project contact: Shauna Harshman | WSDOT Project Manager | 509-324-6196 | erconnects@wsdot.wa.gov | Char Kay | Regional Administrator, WSDOT Eastern Region | 509-324-6010 | charlene.kay@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/liberty-park-land-bridge-reconnecting-east-central-spokane
- Project type
- Pedestrian, cycling and transit access improvements
Contacts
Recorded professional contact
Shauna Harshman | WSDOT Project Manager | 509-324-6196 | erconnects@wsdot.wa.gov | Char Kay | Regional Administrator, WSDOT Eastern Region | 509-324-6010 | charlene.kay@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- $8 million estimate applies to planning, evaluation and structural design; full construction cost is not established.
Agency funding detail (2026-11-06): Planning/evaluation and structural-design phase funding: $8 million, comprising a $4 million federal RAISE grant and $4 million from Move Ahead Washington. This is not a full construction cost.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- Agency-listed project timeline: 2026-2030. Agency stage: Not started.
Agency milestone schedule (reviewed 2026-11-06):
Summer 2026: Existing Conditions, Project Purpose and Need, Environmental Justice Assesment
Fall 2026: Performance measures, Alternatives Development
Winter 2026: Alternatives Evaluation
Spring 2027: Refined Alternatives Development and Evaluation
Summer 2027: Further Refine Recommended Alternative(s)
Fall 2027: Draft Panning Report
2027-2028: Pre-Design and National Environmental Protection Act (NEPA) Evaluation Process
2028-2029: Final Design
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: 2026-2030. Agency stage: Not started. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.