Isle of Palms 2026 Offshore Beach Renourishment

Isle of Palms, Charleston County, South Carolina

Estimated value$22.39M
StageUnder construction
Owner / developerCity of Isle of Palms
Last verified2026-09-30

Project overview

A three-reach offshore beach renourishment project placing up to 2.5 million cubic yards of sand along 19,200 linear feet and constructing a protective dune and berm.

Scope
1.7 million cubic yards on the north end and 800,000 cubic yards on the south end; dune and berm construction; offshore borrow site about two miles southeast of the island pier.
Project type
Beach renourishment and coastal flood resilience
Reported investment / scope
$22,389,508 total project cost
Funding sources
City of Isle of Palms 64%; Wild Dunes Community Association 36%; includes a $1.5 million South Carolina state grant for Reach 3
Delivery method
Dredging and beach placement in three reaches

Organizations involved

Owner / developer
City of Isle of Palms
Developer
Not available
Engineering firm / architect
Not available
General contractor / construction manager
Marinex
EPC contractor
Not available
Technology / equipment providers
Not available
Financial sponsor
Not available
Other recorded participants
City of Isle of Palms; Wild Dunes Community Association; State of South Carolina; Marinex

Business opportunities

Not verified

Current procurement record
Not available
Upcoming procurement
Not available
Contract / package value
Not available
Supplier / subcontractor opportunities
Not available
Workforce requirements
Not available

Check official project / procurement portal ↗

A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.

Timeline & key dates

Expected procurement
Not available
Construction start
2026-07-27 pumping began in Reach 1
Estimated completion
2026-12-15 planned demobilization
Dated milestones
2026-07-27: Reach 1 pumping began.
2026-08-30: Reach 1 completed.
2026-08-31: Reach 2 pumping began.
Mid-October 2026: Reach 2 target.
2026-11-01: Reach 3 pumping target.
2026-12-15: Planned demobilization.
Permitting
Not available
Recent project updates
2026-09-28: Dredging resumed after weather and engine repairs; approximately 12,000 cubic yards moved into Reach 2, which remained on track for mid-October.
2026-09-30: Added to Project Atlas.
Challenges / risks
Offshore weather and dredge maintenance have temporarily interrupted production, but the city said Reach 2 remained on schedule as of September 28.

Related intelligence

No verified record associations have been entered for this project yet.

Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.

Additional project record

Project status: The City of Isle of Palms is placing up to 2.5 million cubic yards of offshore sand along 19,200 feet of beach in three reaches, building a dune and berm system.

Why it matters: The work is designed to reduce erosion, storm-surge and flooding exposure while protecting public infrastructure, recreation and coastal habitat.

Latest verified development: The city reported on September 28, 2026 that dredging had resumed after bad weather and repairs, with roughly 12,000 cubic yards moved that day into Reach 2. Reach 2 remained on track for mid-October.

Official source: City of Isle of Palms project page and September 28 update. Source reviewed September 30, 2026.

Saved searches & recent searches

Sign in to keep searches across devices. Your recent searches on this device appear below.

Join Infraday Free · Sign in
You’re offline. Reconnect to load the latest Infraday updates.