Isle of Palms 2026 Offshore Beach Renourishment
Isle of Palms, Charleston County, South Carolina
Project overview
A three-reach offshore beach renourishment project placing up to 2.5 million cubic yards of sand along 19,200 linear feet and constructing a protective dune and berm.
- Scope
- 1.7 million cubic yards on the north end and 800,000 cubic yards on the south end; dune and berm construction; offshore borrow site about two miles southeast of the island pier.
- Project type
- Beach renourishment and coastal flood resilience
- Reported investment / scope
- $22,389,508 total project cost
- Funding sources
- City of Isle of Palms 64%; Wild Dunes Community Association 36%; includes a $1.5 million South Carolina state grant for Reach 3
- Delivery method
- Dredging and beach placement in three reaches
Organizations involved
- Owner / developer
- City of Isle of Palms
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Marinex
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- City of Isle of Palms; Wild Dunes Community Association; State of South Carolina; Marinex
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
Check official project / procurement portal ↗
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- 2026-07-27 pumping began in Reach 1
- Estimated completion
- 2026-12-15 planned demobilization
- Dated milestones
- 2026-07-27: Reach 1 pumping began.
2026-08-30: Reach 1 completed.
2026-08-31: Reach 2 pumping began.
Mid-October 2026: Reach 2 target.
2026-11-01: Reach 3 pumping target.
2026-12-15: Planned demobilization. - Permitting
- Not available
- Recent project updates
- 2026-09-28: Dredging resumed after weather and engine repairs; approximately 12,000 cubic yards moved into Reach 2, which remained on track for mid-October.
2026-09-30: Added to Project Atlas. - Challenges / risks
- Offshore weather and dredge maintenance have temporarily interrupted production, but the city said Reach 2 remained on schedule as of September 28.
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
Project status: The City of Isle of Palms is placing up to 2.5 million cubic yards of offshore sand along 19,200 feet of beach in three reaches, building a dune and berm system.
Why it matters: The work is designed to reduce erosion, storm-surge and flooding exposure while protecting public infrastructure, recreation and coastal habitat.
Latest verified development: The city reported on September 28, 2026 that dredging had resumed after bad weather and repairs, with roughly 12,000 cubic yards moved that day into Reach 2. Reach 2 remained on track for mid-October.
Official source: City of Isle of Palms project page and September 28 update. Source reviewed September 30, 2026.