Intersection improvements at Ferndale and River roads in Dinwiddie

Dinwiddie County, Virginia · Transportation, Highways and bridges

Stage: ConstructionProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$4.7 million (agency estimate)
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startSummer 2026
Project owner
Virginia Department of Transportation
Delivery method
Not verified
Expected completion
Spring 2027

Overview

Build a roundabout where Ferndale Road meets River Road in Dinwiddie County.

Technical scope

Build a roundabout where Ferndale Road meets River Road in Dinwiddie County.
Agency project references: UPC: 115407; State ID: 0600-026-656; P101.

Agency-published project contact: Aaron French, P.E. | Project Manager/Area Construction Engineer | Aaron.French@vdot.virginia.gov
Contact source: https://www.vdot.virginia.gov/projects/richmond-district/intersection-improvements-at-ferndale-road-route-600-and-river-road-route-601-in-dinwiddie/

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Aaron French, P.E. | Project Manager/Area Construction Engineer | Aaron.French@vdot.virginia.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$4.7 million (agency estimate)

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Summer 2026
Recorded completion
Spring 2027
Recorded milestones
Agency status: Under construction. Agency schedule entry: Summer 2026. Estimated completion: Spring 2027.
Agency public-involvement record: Design public hearing A design public hearing was held on June 14, 2022. Related files Design map Detour Sections Informational handout

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency status: Under construction. Agency schedule entry: Summer 2026. Estimated completion: Spring 2027. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, latitude, longitude, scope, milestones. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.