Transportation, Highways and bridges
Intermodal Center Pedestrian Connector
Miami, FL
Project overview
FY 2026 BUILD award scope: This project will construct a prefabricated, grade-separated pedestrian bridge connecting the Miami Intermodal Center to Miami Freedom Park and the new City Administration Building across NW 21st Street and the Tamiami Canal.
- Scope
- This project will construct a prefabricated, grade-separated pedestrian bridge connecting the Miami Intermodal Center to Miami Freedom Park and the new City Administration Building across NW 21st Street and the Tamiami Canal. The scope of work includes foundations, substructure, a main steel span with an approximately 14-foot clear walkway, plus elevators, stairs, lighting, security systems, drainage, and wayfinding elements at both ends. Work also includes completing final design, environmental documentation, necessary permitting, utility coordination, and construction staging, as well as integrating the bridge with existing MIC facilities and internal Miami Freedom Park circulation through new at-grade connections and vertical circulation structures.
- Project type
- Road — capital award scope
- Reported investment / scope
- $25,000,000 — USDOT total project cost at FY 2026 award; applies to the described award scope.
- Funding sources
- $20,000,000 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- City of Miami Directory profile ↗
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2026 BUILD award scope: This project will construct a prefabricated, grade-separated pedestrian bridge connecting the Miami Intermodal Center to Miami Freedom Park and the new City Administration Building across NW 21st Street and the Tamiami Canal.
Funded scope
This project will construct a prefabricated, grade-separated pedestrian bridge connecting the Miami Intermodal Center to Miami Freedom Park and the new City Administration Building across NW 21st Street and the Tamiami Canal. The scope of work includes foundations, substructure, a main steel span with an approximately 14-foot clear walkway, plus elevators, stairs, lighting, security systems, drainage, and wayfinding elements at both ends. Work also includes completing final design, environmental documentation, necessary permitting, utility coordination, and construction staging, as well as integrating the bridge with existing MIC facilities and internal Miami Freedom Park circulation through new at-grade connections and vertical circulation structures.
Funding at award
$25,000,000 — USDOT total project cost at FY 2026 award; applies to the described award scope.
$20,000,000 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in