Ports and maritime, Transportation
Interconnect Track Planning Project
Granite City Harbor and Madison Harbor, IL
Project overview
FY 2024 RAISE award scope: This project will plan a freight rail connection for the Interconnect Track to link the Port’s Granite City Harbor, which is located north of Locks #27 on the Mississippi River, with the Madison Harbor, which is located south of the Locks.
- Scope
- This project will plan a freight rail connection for the Interconnect Track to link the Port’s Granite City Harbor, which is located north of Locks #27 on the Mississippi River, with the Madison Harbor, which is located south of the Locks. Activities will include public engagement, a feasibility study, review of any existing work, preliminary design, and a benefits cost analysis.
- Project type
- Maritime — planning/design award scope
- Reported investment / scope
- $550,000 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
- Funding sources
- $550,000 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- America's Central Port
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2024 RAISE award scope: This project will plan a freight rail connection for the Interconnect Track to link the Port’s Granite City Harbor, which is located north of Locks #27 on the Mississippi River, with the Madison Harbor, which is located south of the Locks.
Funded scope
This project will plan a freight rail connection for the Interconnect Track to link the Port’s Granite City Harbor, which is located north of Locks #27 on the Mississippi River, with the Madison Harbor, which is located south of the Locks. Activities will include public engagement, a feasibility study, review of any existing work, preliminary design, and a benefits cost analysis.
Funding at award
$550,000 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
$550,000 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in