I-5/Unnamed Tributary to Penny Creek and Silver Lake Fish Passage
Everett, Washington · Resilience and flood protection
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Design-build (agency project page)
- Expected completion
- Not verified
Overview
Remove three fish-passage barriers beneath I-5 near Everett and install crossings designed to reconnect tributaries of Silver Lake and Penny Creek.
Technical scope
Remove three fish-passage barriers beneath I-5 near Everett and install crossings designed to reconnect tributaries of Silver Lake and Penny Creek.
Agency-published project contact: Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/i-5-unnamed-tributary-penny-creek-and-silver-lake-fish-passage
- Project type
- Fish passage and habitat restoration
- Recorded constraints and uncertainties
- Construction timing depends on additional legislative funding; WSDOT has not confirmed when construction funding will become available.
Contacts
Recorded professional contact
Eric Zackula | Communications | 206-440-4483 | Eric.Zackula@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: $61.6 million. This figure is not assumed to be a total project cost. The agency notes that delivery depends on additional state funding for its fish-passage program.
Agency funding detail (2026-11-06): Construction funding has not been secured. WSDOT says additional legislative funding is needed and the timing of construction funding is unknown.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- Agency-listed project timeline: Summer 2025 - Winter 2030. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
2025-2030: Preliminary project design
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Summer 2025 - Winter 2030. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, delivery, risks, funding, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.