I-5/Ship Canal Bridge Stormwater Treatment Facility – Pre-Design
King County, Washington · Water and wastewater, Highways and bridges, Transportation
Source research checked: 2026-11-06
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- Washington State Department of Transportation
- Delivery method
- Not verified
- Expected completion
- Fall 2030: Construction expected to be completed
Overview
Develop a treatment facility beneath the north end of the Ship Canal Bridge to capture highway runoff and remove pollutants before discharge.
Technical scope
Develop a treatment facility beneath the north end of the Ship Canal Bridge to capture highway runoff and remove pollutants before discharge.
Agency-published project contact: Amber Stanley | Environmental Justice and Community Engagement | 206-817-8833 | Amber.Stanley@wsdot.wa.gov
Contact source: https://wsdot.wa.gov/construction-planning/search-projects/i-5-ship-canal-bridge-stormwater-treatment-facility-pre-design
- Project type
- Stormwater treatment
Contacts
Recorded professional contact
Amber Stanley | Environmental Justice and Community Engagement | 206-817-8833 | Amber.Stanley@wsdot.wa.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Recorded funding
- WSDOT funding/budget summary: $6 million. This figure is not assumed to be a total project cost.
Agency funding detail (2026-11-06): $6 million of Move Ahead Washington funds
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded construction start
- Winter 2029: Construction scheduled to begin.
- Recorded completion
- Fall 2030: Construction expected to be completed
- Recorded milestones
- Agency-listed project timeline: Fall 2024 - Fall 2030. Agency stage: Pre-construction.
Agency milestone schedule (reviewed 2026-11-06):
Fall 2024 - Spring 2026: Preliminary Planning
Spring 2026 - Winter 2027: Alternative analysis and planning
Winter 2027 - Winter 2029: Design Phase
Winter 2029: Construction scheduled to begin.
Fall 2030: Construction expected to be completed
Documents & Resources
- WSDOT official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency-listed project timeline: Fall 2024 - Fall 2030. Agency stage: Pre-construction. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, milestones, funding, start, completion, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.