infraday

Connecting infrastructure leaders since 2017.

THE BUSINESS OF
INFRASTRUCTURE
← Project Atlas

Transportation, Highways and bridges

Highway 40 Corridor Multimodal Assessment and Master Plan

Rocky Mount, VA

Estimated value$1M
StageNot verified
Owner / developerTown of Rocky Mount
Last verified2026-10-25

Project overview

FY 2024 RAISE award scope: The awarded scope funds a multimodal assessment and master plan for approximately 1.5 miles of Highway 40 between Booker Washington Highway (Route 122) and Main Street, plus approximately 0.7 miles of Tanyard Road to North Main Street.

Scope
The awarded scope funds a multimodal assessment and master plan for approximately 1.5 miles of Highway 40 between Booker Washington Highway (Route 122) and Main Street, plus approximately 0.7 miles of Tanyard Road to North Main Street. The plan considers access management, Complete Streets, frontage roads, bicycle infrastructure, and park-and-ride improvements.
Project type
Road — planning/design award scope
Reported investment / scope
$1,000,000 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.
Funding sources
$1,000,000 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Delivery method
Not available

Organizations involved

Owner / developer
Town of Rocky Mount
Developer
Not available
Engineering firm / architect
Not available
General contractor / construction manager
Not available
EPC contractor
Not available
Technology / equipment providers
Not available
Financial sponsor
Not available
Other recorded participants
Not available

Business opportunities

Not verified

Current procurement record
Not available
Upcoming procurement
Not available
Contract / package value
Not available
Supplier / subcontractor opportunities
Not available
Workforce requirements
Not available

A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.

Timeline & key dates

Expected procurement
Not available
Construction start
Not available
Estimated completion
Not available
Dated milestones
Not available
Permitting
Not available
Recent project updates
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.
Challenges / risks
Not available

Related intelligence

No verified record associations have been entered for this project yet.

Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.

Additional project record

FY 2024 RAISE award scope: The awarded scope funds a multimodal assessment and master plan for approximately 1.5 miles of Highway 40 between Booker Washington Highway (Route 122) and Main Street, plus approximately 0.7 miles of Tanyard Road to North Main Street.

Funded scope

The awarded scope funds a multimodal assessment and master plan for approximately 1.5 miles of Highway 40 between Booker Washington Highway (Route 122) and Main Street, plus approximately 0.7 miles of Tanyard Road to North Main Street. The plan considers access management, Complete Streets, frontage roads, bicycle infrastructure, and park-and-ride improvements.

Funding at award

$1,000,000 — USDOT total project cost at FY 2024 award; planning/design scope, not the future construction budget.

$1,000,000 FY 2024 RAISE planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.

Source and verification

Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2024 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. Coordinates reproduce the USDOT award location and are approximate; they do not establish surveyed site boundaries.

USDOT awarded-projects publication · Official awards workbook

Saved searches & recent searches

Sign in to keep searches across devices. Your recent searches on this device appear below.

Join Infraday Free · Sign in
You’re offline. Reconnect to load the latest Infraday updates.