Transportation, Highways and bridges
Fort Washington Way Project
Hamilton County, OH
Project overview
FY 2026 BUILD award scope: The project includes all preliminary design, environmental documentation, final design, and construction associated with Phase 1 of the project.
- Scope
- The project includes all preliminary design, environmental documentation, final design, and construction associated with Phase 1 of the project. The project will construct an approximate 1.2-acre highway cap and plaza over the eight-lane divided sunken highway which carries I-71/U.S. Route 50, known locally known as Fort Washington Way (FWW). The project will also reconfigure local surface streets.
- Project type
- Road — capital award scope
- Reported investment / scope
- $50,000,000 — USDOT total project cost at FY 2026 award; applies to the described award scope.
- Funding sources
- $25,000,000 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- Hamilton County
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2026 BUILD award scope: The project includes all preliminary design, environmental documentation, final design, and construction associated with Phase 1 of the project.
Funded scope
The project includes all preliminary design, environmental documentation, final design, and construction associated with Phase 1 of the project. The project will construct an approximate 1.2-acre highway cap and plaza over the eight-lane divided sunken highway which carries I-71/U.S. Route 50, known locally known as Fort Washington Way (FWW). The project will also reconfigure local surface streets.
Funding at award
$50,000,000 — USDOT total project cost at FY 2026 award; applies to the described award scope.
$25,000,000 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in