Rail and transit, Transportation
Flood Resilience And Multi-Modal Improvements At I-380 Through UP Railroad Project
Linn County, IA: Iowa
Project overview
City of Cedar Rapids is the recipient of a $25,000,000 FY 2025 BUILD Round 2 grant for Flood Resilience And Multi-Modal Improvements At I-380 Through UP Railroad Project in Linn County, IA.
- Scope
- This project will complete the design, right-of-way acquisition, and construction of flood resiliency and multimodal improvements from I-380 to the Union Pacific Railroad. The project includes an approximately 0.3-mile levee and realignment of F Avenue “up and over” the levee, with a trail along the top. Additional components include converting F Avenue from a one-way to a two-way configuration, constructing a floodwall from E Avenue to the existing levee south of I-380, a roundabout on F Avenue, a stormwater conveyance system, a railroad flood gate, and a pedestrian bridge.
- Project type
- Rail and transit infrastructure — capital award
- Reported investment / scope
- Total project cost not established by this entry
- Funding sources
- FY 2025 BUILD Round 2 capital award: $25,000,000 federal grant
- Delivery method
- Not available
Organizations involved
- Owner / developer
- City of Cedar Rapids
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
Check official project / procurement portal ↗
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- April 2028 — estimate in FY 2025 award fact sheet; not reconfirmed
- Estimated completion
- Not confirmed
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- FY 2025 BUILD Round 2 capital award. The source documents a 2025 grant award, not a current construction or tender update. Award amount is the federal grant, not total project cost. Current delivery status and procurement availability have not been independently confirmed.
- Challenges / risks
- Award record does not confirm current project status, full funding or availability of contracts.
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
City of Cedar Rapids is the recipient of a $25,000,000 FY 2025 BUILD Round 2 grant for Flood Resilience And Multi-Modal Improvements At I-380 Through UP Railroad Project in Linn County, IA.
This project will complete the design, right-of-way acquisition, and construction of flood resiliency and multimodal improvements from I-380 to the Union Pacific Railroad. The project includes an approximately 0.3-mile levee and realignment of F Avenue “up and over” the levee, with a trail along the top. Additional components include converting F Avenue from a one-way to a two-way configuration, constructing a floodwall from E Avenue to the existing levee south of I-380, a roundabout on F Avenue, a stormwater conveyance system, a railroad flood gate, and a pedestrian bridge.
Award record: FY 2025 BUILD Round 2 capital award. Federal grant: $25,000,000. Recipient: City of Cedar Rapids. Location: Linn County, IA: Iowa.
Construction start: April 2028 — estimate in FY 2025 award fact sheet; not reconfirmed. Completion, contractor, designer and current bid deadlines are not confirmed in this entry.
The source documents a 2025 grant award, not a current construction or tender update. Award amount is the federal grant, not total project cost. Current delivery status and procurement availability have not been independently confirmed.
Official USDOT award fact sheet, page 12. Award record reviewed October 24, 2026.