Elk River Downtown Transportation Safety Project

Elk River, MN

Estimated value$7.2M
StageNot verified
Owner / developerCity of Elk River
Last verified2026-10-25

Project overview

FY 2026 BUILD award scope: The project is a planning initiative to evaluate multimodal safety, mobility, and connectivity improvements of Trunk Highway 10 (TH10), the intersection with Main Street, and the BNSF at grade rail crossings on Main Street and Jackson Avenue.

Scope
The project is a planning initiative to evaluate multimodal safety, mobility, and connectivity improvements of Trunk Highway 10 (TH10), the intersection with Main Street, and the BNSF at grade rail crossings on Main Street and Jackson Avenue. The study will analyze the TH10 corridor for safety improvements and access management to 10–30 percent design alongside preliminary environmental review.
Project type
Road — planning/design award scope
Reported investment / scope
$7,197,120 — USDOT total project cost at FY 2026 award; planning/design scope, not the future construction budget.
Funding sources
$5,757,696 FY 2026 BUILD planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Delivery method
Not available

Organizations involved

Owner / developer
City of Elk River
Developer
Not available
Engineering firm / architect
Not available
General contractor / construction manager
Not available
EPC contractor
Not available
Technology / equipment providers
Not available
Financial sponsor
Not available
Other recorded participants
Not available

Business opportunities

Not verified

Current procurement record
Not available
Upcoming procurement
Not available
Contract / package value
Not available
Supplier / subcontractor opportunities
Not available
Workforce requirements
Not available

A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.

Timeline & key dates

Expected procurement
Not available
Construction start
Not available
Estimated completion
Not available
Dated milestones
Not available
Permitting
Not available
Recent project updates
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.
Challenges / risks
Not available

Related intelligence

No verified record associations have been entered for this project yet.

Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.

Additional project record

FY 2026 BUILD award scope: The project is a planning initiative to evaluate multimodal safety, mobility, and connectivity improvements of Trunk Highway 10 (TH10), the intersection with Main Street, and the BNSF at grade rail crossings on Main Street and Jackson Avenue.

Funded scope

The project is a planning initiative to evaluate multimodal safety, mobility, and connectivity improvements of Trunk Highway 10 (TH10), the intersection with Main Street, and the BNSF at grade rail crossings on Main Street and Jackson Avenue. The study will analyze the TH10 corridor for safety improvements and access management to 10–30 percent design alongside preliminary environmental review.

Funding at award

$7,197,120 — USDOT total project cost at FY 2026 award; planning/design scope, not the future construction budget.

$5,757,696 FY 2026 BUILD planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.

Source and verification

Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.

USDOT awarded-projects publication · Official awards workbook

Saved searches & recent searches

Sign in to keep searches across devices. Your recent searches on this device appear below.

Join Infraday Free · Sign in
You’re offline. Reconnect to load the latest Infraday updates.