Project overview
FY 2026 BUILD award scope: The project will fund the design for the upland facilities for the Elim Subsistence Harbor in coordination with the US Army Corps of Engineers, who will design the underwater components.
- Scope
- The project will fund the design for the upland facilities for the Elim Subsistence Harbor in coordination with the US Army Corps of Engineers, who will design the underwater components. This will include design of a boat launch, barge landing with two moorage points, tender dock, a boat moorage area, approximately 1 acre of uplands for vehicle and trailer parking with boat storage, and an access road approximately 250 ft in length to connect the uplands to the boat launch. Work will include conceptual design, environmental review, and final design and specifications.
- Project type
- Maritime — planning/design award scope
- Reported investment / scope
- $9,329,503 — USDOT total project cost at FY 2026 award; planning/design scope, not the future construction budget.
- Funding sources
- $3,969,503 FY 2026 BUILD planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- Kawerak, Inc.
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. No coordinates supplied for this award; no map pin has been inferred.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2026 BUILD award scope: The project will fund the design for the upland facilities for the Elim Subsistence Harbor in coordination with the US Army Corps of Engineers, who will design the underwater components.
Funded scope
The project will fund the design for the upland facilities for the Elim Subsistence Harbor in coordination with the US Army Corps of Engineers, who will design the underwater components. This will include design of a boat launch, barge landing with two moorage points, tender dock, a boat moorage area, approximately 1 acre of uplands for vehicle and trailer parking with boat storage, and an access road approximately 250 ft in length to connect the uplands to the boat launch. Work will include conceptual design, environmental review, and final design and specifications.
Funding at award
$9,329,503 — USDOT total project cost at FY 2026 award; planning/design scope, not the future construction budget.
$3,969,503 FY 2026 BUILD planning grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. No coordinates supplied for this award; no map pin has been inferred.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in