Overview
Deliver four bridge replacements and one bridge-deck replacement across Mecklenburg, Pittsylvania and Brunswick counties under a combined design-build contract.
Technical scope
Deliver four bridge replacements and one bridge-deck replacement across Mecklenburg, Pittsylvania and Brunswick counties under a combined design-build contract.
Agency-published project contact: Beau Gutridge PE, CCM, PMP, DBIA | Project Manager/Area Construction Engineer | Beau.Gutridge@VDOT.Virginia.gov
Contact source: https://www.vdot.virginia.gov/projects/richmond-district/design-build-bridge-contract-multiple-structures-in-richmondlynchburg-/
- Project type
- Road, bridge and multimodal improvements
Contacts
Recorded professional contact
Beau Gutridge PE, CCM, PMP, DBIA | Project Manager/Area Construction Engineer | Beau.Gutridge@VDOT.Virginia.gov
Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.
Recorded contact source ↗Source check recorded: 2026-11-06
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Reported project value
- $57.9 million (agency estimate)
Agency cost detail (2026-11-06): UPC 118301: Route 58 over Big Buffalo: $11.9 million; UPC 122818: Route 40 over Pigg River: $15.5 million; UPC 122857: Route 58 BUS over Coleman Creek: $3.9 million; UPC 122858: I-85 over Roanoke River: $20.1 million; UPC 123043: Route 1 over Shining Creek: $6.5 million. Components are not separate contract awards.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded construction start
- Spring 2025
- Recorded completion
- Winter 2030
- Recorded milestones
- Agency status: Under construction. Agency schedule entry: Spring 2025. Estimated completion: Winter 2030.
Agency public-involvement record: The notification of VDOT's Willingness to hold a Public Hearing was advertised June 30, 2024.
Documents & Resources
- Virginia Department of Transportation official project page ↗Reviewed 2026-11-06
Updates & Intelligence
Earlier recorded updates
2026-11-06: Newly indexed from the agency project page. Agency status: Under construction. Agency schedule entry: Spring 2025. Estimated completion: Winter 2030. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, latitude, longitude, value, milestones, scope. Planned procurement milestones do not establish an open bid.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.