Brunswick County, Mecklenburg County, Pittsylvania County, Virginia · Transportation, Highways and bridges

Stage: ConstructionProcurement: No procurement verified

Source research checked: 2026-11-06

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$57.9 million (agency estimate) Agency cost detail (2026-11-06): UPC 118301: Route 58 over Big Buffalo: $11.9 million; UPC 122818: Route 40 over Pigg River: $15.5 million; UPC 122857: Route 58 BUS over Coleman Creek: $3.9 million; UPC 122858: I-85 over Roanoke River: $20.1 million; UPC 123043: Route 1 over Shining Creek: $6.5 million. Components are not separate contract awards.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startSpring 2025
Project owner
Virginia Department of Transportation
Delivery method
Not verified
Expected completion
Winter 2030

Overview

Deliver four bridge replacements and one bridge-deck replacement across Mecklenburg, Pittsylvania and Brunswick counties under a combined design-build contract.

Technical scope

Deliver four bridge replacements and one bridge-deck replacement across Mecklenburg, Pittsylvania and Brunswick counties under a combined design-build contract.

Agency-published project contact: Beau Gutridge PE, CCM, PMP, DBIA | Project Manager/Area Construction Engineer | Beau.Gutridge@VDOT.Virginia.gov
Contact source: https://www.vdot.virginia.gov/projects/richmond-district/design-build-bridge-contract-multiple-structures-in-richmondlynchburg-/

Project type
Road, bridge and multimodal improvements

Contacts

Recorded professional contact

Beau Gutridge PE, CCM, PMP, DBIA | Project Manager/Area Construction Engineer | Beau.Gutridge@VDOT.Virginia.gov

Recorded contact information. Current role and contact reachability have not been independently rechecked; confirm through the linked source before outreach.

Recorded contact source ↗

Source check recorded: 2026-11-06

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$57.9 million (agency estimate)
Agency cost detail (2026-11-06): UPC 118301: Route 58 over Big Buffalo: $11.9 million; UPC 122818: Route 40 over Pigg River: $15.5 million; UPC 122857: Route 58 BUS over Coleman Creek: $3.9 million; UPC 122858: I-85 over Roanoke River: $20.1 million; UPC 123043: Route 1 over Shining Creek: $6.5 million. Components are not separate contract awards.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded construction start
Spring 2025
Recorded completion
Winter 2030
Recorded milestones
Agency status: Under construction. Agency schedule entry: Spring 2025. Estimated completion: Winter 2030.
Agency public-involvement record: The notification of VDOT's Willingness to hold a Public Hearing was advertised June 30, 2024.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-06: Newly indexed from the agency project page. Agency status: Under construction. Agency schedule entry: Spring 2025. Estimated completion: Winter 2030. Procurement availability has not been verified.
2026-11-06: Official-source enrichment added or expanded contacts, latitude, longitude, value, milestones, scope. Planned procurement milestones do not establish an open bid.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.