Transportation, Highways and bridges
County Road 50E Corridor Planning & Design
Larimer County, CO: Colorado
Project overview
Larimer County is the recipient of a $1,160,850 FY 2025 RAISE Round 1 grant for County Road 50E Corridor Planning & Design in Larimer County, CO.
- Scope
- This project will fund the planning and design of multimodal and safety improvements for Larimer County Road 50E (LCR 50E). The project will include all pre-construction activities such as survey, right-of-way research, feasibility studies, geotechnical investigations, planning for drainage and hydraulics, preparation of final design plans and bid packages, utility coordination, permitting, environmental coordination, and additional analysis and mitigation. The final design will include approximately 11' travel lanes (one in each direction), 4’ shoulders and a 10’ multi-use trail. The design will also include improving intersections with roundabouts, calming circles, adding turn lanes, and raised crosswalks.
- Project type
- Road, bridge and corridor improvements — planning award
- Reported investment / scope
- Total project cost not established by this entry
- Funding sources
- FY 2025 RAISE Round 1 planning award: $1,160,850 federal grant
- Delivery method
- Not available
Organizations involved
- Owner / developer
- Larimer County
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
Check official project / procurement portal ↗
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not applicable to planning award
- Estimated completion
- Not confirmed
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- FY 2025 RAISE Round 1 planning award. The source documents a 2025 grant award, not a current construction or tender update. Award amount is the federal grant, not total project cost. Current delivery status and procurement availability have not been independently confirmed.
- Challenges / risks
- Award record does not confirm current project status, full funding or availability of contracts.
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
Larimer County is the recipient of a $1,160,850 FY 2025 RAISE Round 1 grant for County Road 50E Corridor Planning & Design in Larimer County, CO.
This project will fund the planning and design of multimodal and safety improvements for Larimer County Road 50E (LCR 50E). The project will include all pre-construction activities such as survey, right-of-way research, feasibility studies, geotechnical investigations, planning for drainage and hydraulics, preparation of final design plans and bid packages, utility coordination, permitting, environmental coordination, and additional analysis and mitigation. The final design will include approximately 11' travel lanes (one in each direction), 4’ shoulders and a 10’ multi-use trail. The design will also include improving intersections with roundabouts, calming circles, adding turn lanes, and raised crosswalks.
Award record: FY 2025 RAISE Round 1 planning award. Federal grant: $1,160,850. Recipient: Larimer County. Location: Larimer County, CO: Colorado.
Construction start: Not applicable to planning award. Completion, contractor, designer and current bid deadlines are not confirmed in this entry.
The source documents a 2025 grant award, not a current construction or tender update. Award amount is the federal grant, not total project cost. Current delivery status and procurement availability have not been independently confirmed.
Official USDOT award fact sheet, page 34. Award record reviewed October 24, 2026.