Renewable energy
Country Acres Clean Power — Solar and Storage
Placer County, California
Project overview
EIA's September 2026 inventory lists Country Acres Clean Power LLC in Placer County, California, with 172 MW of battery storage power capacity; 344 MW of solar photovoltaic generation. The reporting entity is Clenera DevCo LLC.
- Scope
- EIA plant ID 68940; 2 planned generator/storage unit records, grouped as one project. Reported nameplate capacity: 172 MW of battery storage power capacity; 344 MW of solar photovoltaic generation. Battery figures are power ratings in MW; storage duration and energy capacity in MWh are not established by this record. Unit status detail as of September 2026: (V) Under construction, more than 50 percent complete: generator IDs CABS; (U) Under construction, less than or equal to 50 percent complete: generator IDs CAPV.
- Project type
- Solar photovoltaic and battery storage
- Reported investment / scope
- Not available
- Funding sources
- Not available
- Delivery method
- Not available
Organizations involved
- Owner / developer
- Clenera DevCo LLC
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- EIA reporting entity: Clenera DevCo LLC
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
Check official project / procurement portal ↗
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- February 2027 (reported planned operation; September 2026 inventory; subject to change)
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- 2026-10-25: Checked against EIA's September 2026 preliminary inventory, released October 23, 2026. Reported status: (V) Under construction, more than 50 percent complete; (U) Under construction, less than or equal to 50 percent complete. The Atlas stage reflects the most advanced reported unit; other units have the individual statuses shown in scope. The owner field reproduces EIA’s reporting Entity Name and does not independently establish ultimate ownership. Reported operating dates and capacities are preliminary, not commitments. Map coordinates are EIA-reported plant points and are approximate. Project budget, contractor awards and open bids are not verified by this source.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
EIA's September 2026 inventory lists Country Acres Clean Power LLC in Placer County, California, with 172 MW of battery storage power capacity; 344 MW of solar photovoltaic generation. The reporting entity is Clenera DevCo LLC.
Project scope
EIA plant ID 68940; 2 planned generator/storage unit records, grouped as one project. Reported nameplate capacity: 172 MW of battery storage power capacity; 344 MW of solar photovoltaic generation. Battery figures are power ratings in MW; storage duration and energy capacity in MWh are not established by this record. Unit status detail as of September 2026: (V) Under construction, more than 50 percent complete: generator IDs CABS; (U) Under construction, less than or equal to 50 percent complete: generator IDs CAPV.
Sponsor and location
Reported organization: Clenera DevCo LLC
Location: Placer County, California
Status and schedule
2026-10-25: Checked against EIA's September 2026 preliminary inventory, released October 23, 2026. Reported status: (V) Under construction, more than 50 percent complete; (U) Under construction, less than or equal to 50 percent complete. The Atlas stage reflects the most advanced reported unit; other units have the individual statuses shown in scope. The owner field reproduces EIA’s reporting Entity Name and does not independently establish ultimate ownership. Reported operating dates and capacities are preliminary, not commitments. Map coordinates are EIA-reported plant points and are approximate. Project budget, contractor awards and open bids are not verified by this source.
Reported operating target: February 2027 (reported planned operation; September 2026 inventory; subject to change)
Source verification
EIA Form 860M, September 2026 preliminary inventory, Planned worksheet, plant ID 68940, Excel rows 614–615. Published October 23, 2026; checked October 25, 2026. Only the units in the Planned worksheet are included.
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in