Blackjack Road Safety Improvements – Mississippi State University

Mississippi State University, Mississippi · Transportation, Highways and bridges, Education infrastructure

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$6,093,446 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Mississippi State University
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected Mississippi State University for a $4,874,757 FY 2026 SS4A implementation grant. The project will implement the Blackjack Road Safety Improvements corridor project along Blackjack Road from Locksley Way to Wingo Way near campus.

Technical scope

The project will implement the Blackjack Road Safety Improvements corridor project along Blackjack Road from Locksley Way to Wingo Way near campus. The project will address recurring intersection and corridor crashes, low-light visibility issues, congestion-related conflicts, and gaps in pedestrian infrastructure on a 3-lane minor arterial with an annual average daily traffic of 17,000 and a 30 MPH speed limit. Improvements include restriping and lane reconfiguration, repurposing a channelized turn lane, adding a westbound through lane near Stone Boulevard, systemic signing and marking improvements, yellow retroreflective backplates, flashing yellow arrow operations, leading pedestrian intervals, a marked mid-block crossing, and conversion and construction of multi-use paths. Between 2019 and 2023, the corridor experienced 144 crashes, including 7 suspected serious injury crashes, and 36% occurred in dark, dawn, or dusk conditions; from 2024 to 2025, there were 3 additional vulnerable road user crashes. The project includes FHWA Proven Safety Countermeasures and crash modification factors, including an estimated 47% reduction, or 22 crashes, from the road section treatments.

Project type
Road safety infrastructure

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: Mississippi State University; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$6,093,446 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$4,874,757 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.