Barrington Road Reconstruction and Safety Improvements Project
Tontitown, AR
Project overview
FY 2026 BUILD award scope: This project will reconstruct approximately 3,500 linear feet (approximately 0.66 miles) of South Barrington Road from East Bandini Avenue to Taldo Loop.
- Scope
- This project will reconstruct approximately 3,500 linear feet (approximately 0.66 miles) of South Barrington Road from East Bandini Avenue to Taldo Loop. The scope of work includes widening the existing roadway to a three-lane section with a dedicated center turn lane, full-depth pavement reconstruction, installing curb and gutter, and adding a fully enclosed storm sewer system. Additional improvements include an approximately 12-foot multi-use path, an approximately 6-foot ADA-compliant sidewalk, decorative lighting, and streetscape enhancements.
- Project type
- Road — capital award scope
- Reported investment / scope
- $17,574,652 — USDOT total project cost at FY 2026 award; applies to the described award scope.
- Funding sources
- $17,574,652 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
- Delivery method
- Not available
Organizations involved
- Owner / developer
- City of Tontitown
- Developer
- Not available
- Engineering firm / architect
- Not available
- General contractor / construction manager
- Not available
- EPC contractor
- Not available
- Technology / equipment providers
- Not available
- Financial sponsor
- Not available
- Other recorded participants
- Not available
Business opportunities
Not verified
- Current procurement record
- Not available
- Upcoming procurement
- Not available
- Contract / package value
- Not available
- Supplier / subcontractor opportunities
- Not available
- Workforce requirements
- Not available
A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.
Timeline & key dates
- Expected procurement
- Not available
- Construction start
- Not available
- Estimated completion
- Not available
- Dated milestones
- Not available
- Permitting
- Not available
- Recent project updates
- Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.
- Challenges / risks
- Not available
Related intelligence
No verified record associations have been entered for this project yet.
Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.
Additional project record
FY 2026 BUILD award scope: This project will reconstruct approximately 3,500 linear feet (approximately 0.66 miles) of South Barrington Road from East Bandini Avenue to Taldo Loop.
Funded scope
This project will reconstruct approximately 3,500 linear feet (approximately 0.66 miles) of South Barrington Road from East Bandini Avenue to Taldo Loop. The scope of work includes widening the existing roadway to a three-lane section with a dedicated center turn lane, full-depth pavement reconstruction, installing curb and gutter, and adding a fully enclosed storm sewer system. Additional improvements include an approximately 12-foot multi-use path, an approximately 6-foot ADA-compliant sidewalk, decorative lighting, and streetscape enhancements.
Funding at award
$17,574,652 — USDOT total project cost at FY 2026 award; applies to the described award scope.
$17,574,652 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Source and verification
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Location names the recipient jurisdiction; project limits are described in the awarded scope. No coordinates supplied for this award; no map pin has been inferred.
USDOT awarded-projects publication · Official awards workbook
Saved searches & recent searches
Sign in to keep searches across devices. Your recent searches on this device appear below.
Join Infraday Free · Sign in