← Infraday Projects

INFRADAY PROJECTS

Banita Creek- Spindlepop Solar

Nacogdoches County, Texas · Renewable energy

Stage: ConstructionProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project valueNot verified
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Parliament Energy Holdings LLC
Delivery method
Not verified
Expected completion
April 2027 to June 2028 (EIA-reported planned unit operation in the September 2026 inventory; subject to change)

Overview

EIA's September 2026 inventory reports 302.9 MW batteries; 371 MW solar photovoltaic in planned units at Banita Creek- Spindlepop Solar, Nacogdoches County, Texas.

Technical scope

EIA plant IDs: 65853. Planned units are grouped as one project; existing operating units are outside this scope.
Plant 65853, generator MIDBS: Batteries; nameplate 302.9 MW; net summer 302.9 MW; net winter 302.9 MW; planned operation April 2027; (L) Regulatory approvals pending. Not under construction.
Plant 65853, generator MIDPV: Solar Photovoltaic; nameplate 371 MW; net summer 371 MW; net winter 371 MW; planned operation June 2028; (U) Under construction, less than or equal to 50 percent complete.

Project type
Batteries / Solar Photovoltaic

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
EIA reporting entities: Parliament Energy Holdings LLC; balancing authority code(s): ERCO

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Project cost and funding have not yet been verified.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded completion
April 2027 to June 2028 (EIA-reported planned unit operation in the September 2026 inventory; subject to change)

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Newly indexed from EIA. Status and dates reflect the September 2026 preliminary inventory, released October 23, 2026. The project stage reflects the most advanced reported unit. Capacities are preliminary and are separated by technology; generation and battery ratings must not be treated as simultaneous site export capacity. EIA reporting entities are not independently verified ultimate owners. Project costs, contractors and procurement are not established by this dataset.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.

You’re offline. Reconnect to load the latest Infraday updates.