Balch Springs Multimodal Safety and Post-Crash Care Improvements
City of Balch Springs, Texas · Transportation, Highways and bridges
Source research checked: Not recorded
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- City of Balch Springs
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
USDOT selected City of Balch Springs for a $7,779,147 FY 2026 SS4A implementation grant. The project will implement multimodal safety improvements on Elam Road, systemic pedestrian crossing upgrades, and citywide emergency vehicle preemption.
Technical scope
The project will implement multimodal safety improvements on Elam Road, systemic pedestrian crossing upgrades, and citywide emergency vehicle preemption. The project addresses a documented severe crash problem: between 2020 and 2024, the city recorded 27 fatalities and 104 serious injuries, and the high-injury network accounted for 83% of killed or seriously injured crashes on 10% of the street network. Work includes sidewalk and ramp improvements, a 10-foot shared use path, lighting, signal upgrades and retiming, 2 pedestrian hybrid beacons on Lake June Road, and 3 rectangular rapid-flashing beacons on Elam Road and Shepherd Lane. On Elam Road alone, 5 vulnerable road user crashes occurred between 2020 and 2024, including 2 serious injuries, while the targeted Lake June Road and Shepherd Lane segments had 12 vulnerable road user crashes, including 2 fatalities and 3 serious injuries. The project will also equip all city-maintained signalized intersections and fire and police vehicles with emergency vehicle preemption, which is expected to reduce response times by 14% to 23%. Many elements align with FHWA Proven Safety Countermeasures, including sidewalks, lighting, pedestrian hybrid beacons, and rectangular rapid-flashing beacons. This project includes Planning and Demonstration funds to complete supplemental planning activities, design, and public engagement for pedestrian crossings and emergency preemption improvements. These activities include additional road user data collection, surveys to confirm crossing locations, and feasibility analysis for the Elam Road and Pioneer Road intersection.
- Project type
- Road safety infrastructure
Contacts
Project contact research is not yet verified. Use the official agency contact route while research is completed.
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
- Recorded organizations
- Lead applicant: City of Balch Springs; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Reported project value
- $9,723,934 total project cost in the FY 2026 award record; award-time scope and estimate.
- Recorded funding
- $7,779,147 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- 2026-10-30: FY 2026 SS4A award announced.
Documents & Resources
- USDOT FY 2026 SS4A full award list ↗2026-10-30Applicant, project scope, state, grant type, federal award and total project cost
- USDOT FY26 SS4A award workbook ↗2026-10-30Project: Balch Springs Multimodal Safety and Post-Crash Care Improvements; applicant: City of Balch Springs
Updates & Intelligence
Earlier recorded updates
2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.