infraday

Connecting infrastructure leaders since 2017.

THE BUSINESS OF
INFRASTRUCTURE
← Project Atlas

Transportation, Highways and bridges

Avenue of the Saints Rural Safety and Freight Mobility Project

IA 58 and Greenhill Road, IA

Estimated value$64.92M
StageNot verified
Owner / developerIowa Department of Transportation
Last verified2026-10-25

Project overview

FY 2026 BUILD award scope: The project will convert the current at-grade signalized intersection at Iowa Highway 58 (IA 58) and Greenhill Road into a “double-teardrop” roundabout interchange, with IA 58 passing under Greenhill Road.

Scope
The project will convert the current at-grade signalized intersection at Iowa Highway 58 (IA 58) and Greenhill Road into a “double-teardrop” roundabout interchange, with IA 58 passing under Greenhill Road. The project also includes ADA-compliant crosswalks with rectangular rapid flashing beacons, lighting, noise barriers, and reconstructed stormwater and detention infrastructure.
Project type
Road — capital award scope
Reported investment / scope
$64,915,864 — USDOT total project cost at FY 2026 award; applies to the described award scope.
Funding sources
$24,000,000 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.
Delivery method
Not available

Organizations involved

Owner / developer
Iowa Department of Transportation Directory profile ↗
Developer
Not available
Engineering firm / architect
Not available
General contractor / construction manager
Not available
EPC contractor
Not available
Technology / equipment providers
Not available
Financial sponsor
Not available
Other recorded participants
Not available

Business opportunities

Not verified

Current procurement record
Not available
Upcoming procurement
Not available
Contract / package value
Not available
Supplier / subcontractor opportunities
Not available
Workforce requirements
Not available

A project listing is not an open solicitation. Check the source for eligibility, current status, closing time and addenda.

Timeline & key dates

Expected procurement
Not available
Construction start
Not available
Estimated completion
Not available
Dated milestones
Not available
Permitting
Not available
Recent project updates
Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. No coordinates supplied for this award; no map pin has been inferred.
Challenges / risks
Not available

Related intelligence

No verified record associations have been entered for this project yet.

Connections use recorded entity IDs and public evidence. Shared keywords do not establish a relationship.

Additional project record

FY 2026 BUILD award scope: The project will convert the current at-grade signalized intersection at Iowa Highway 58 (IA 58) and Greenhill Road into a “double-teardrop” roundabout interchange, with IA 58 passing under Greenhill Road.

Funded scope

The project will convert the current at-grade signalized intersection at Iowa Highway 58 (IA 58) and Greenhill Road into a “double-teardrop” roundabout interchange, with IA 58 passing under Greenhill Road. The project also includes ADA-compliant crosswalks with rectangular rapid flashing beacons, lighting, noise barriers, and reconstructed stormwater and detention infrastructure.

Funding at award

$64,915,864 — USDOT total project cost at FY 2026 award; applies to the described award scope.

$24,000,000 FY 2026 BUILD grant selected by USDOT. Selection does not establish a construction contract award or current obligation/disbursement status.

Source and verification

Source checked 2026-10-25 against the USDOT historical awards workbook, updated 2026-07-07. Scope and financial figures are reported at the FY 2026 award and are not a current cost re-estimate. The listed organization is the USDOT applicant/recipient; individual asset ownership is not separately verified. Current delivery stage, construction progress, contractors, bid status, and completion dates were not established by this award record. Project area from award title/scope. No coordinates supplied for this award; no map pin has been inferred.

USDOT awarded-projects publication · Official awards workbook

Saved searches & recent searches

Sign in to keep searches across devices. Your recent searches on this device appear below.

Join Infraday Free · Sign in
You’re offline. Reconnect to load the latest Infraday updates.