AST Benson Park Road Safety and Connectivity Improvement Project

Absentee Shawnee Tribe, Oklahoma · Transportation, Highways and bridges

Stage: Not verifiedProcurement: No procurement verified

Source research checked: Not recorded

Saved projects appear in your existing research workspace. Saving does not change email preferences.

Recorded project value$6,000,742 total project cost in the FY 2026 award record; award-time scope and estimate.
Construction estimateNot separately verified
Recorded procurement milestoneNot verifiedSee the source and current procurement status.
Construction startNot verified
Project owner
Absentee Shawnee Tribe
Delivery method
Not verified
Expected completion
Not verified

Overview

USDOT selected Absentee Shawnee Tribe for a $4,800,593 FY 2026 SS4A implementation grant. The project will improve safety and connectivity along 0.9 mile of Benson Park Road from Highway 177 to Tecumseh Lake in Shawnee, Oklahoma.

Technical scope

The project will improve safety and connectivity along 0.9 mile of Benson Park Road from Highway 177 to Tecumseh Lake in Shawnee, Oklahoma. The project will reconstruct the corridor, add eastbound and westbound turn lanes at Highway 177, install 45 roadway light poles, construct continuous sidewalks, and upgrade drainage, traffic signal, signage, and pavement marking elements. It addresses documented safety issues that include 2 fatal vehicle crashes, 1 injury crash between 2019 and 2023, and 1 fatal vulnerable road user (VRU) crash plus 1 possible VRU injury crash between 2015 and 2021. Current conditions include inadequate lighting, unsafe turning movements, and no continuous pedestrian facilities, while traffic is expected to grow from 920 average annual daily traffic in 2021 by an estimated 2,200 to 3,500 additional daily trips from a nearby healthcare campus. The proposed improvements align with FHWA Proven Safety Countermeasures and the Safe System Approach by reducing conflict points, improving visibility, and providing safer access for pedestrian travel.

Project type
Road safety infrastructure

Contacts

Project contact research is not yet verified. Use the official agency contact route while research is completed.

Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.

Opportunities & Contracts

No procurement verified

No linked, currently verified solicitation has been established for this project.

Companies Involved

Recorded organizations
Lead applicant: Absentee Shawnee Tribe; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.

Specific roles and award relationships remain subject to source verification.

Budget & Funding

Reported project value
$6,000,742 total project cost in the FY 2026 award record; award-time scope and estimate.
Recorded funding
$4,800,593 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.

Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.

Timeline & Milestones

Recorded milestones
2026-10-30: FY 2026 SS4A award announced.

Documents & Resources

Updates & Intelligence

Earlier recorded updates

2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.

Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.