5th Street Corridor Safety Enhancement Project
City of Columbus, Mississippi · Transportation, Highways and bridges
Source research checked: Not recorded
Saved projects appear in your existing research workspace. Saving does not change email preferences.
- Project owner
- City of Columbus
- Delivery method
- Not verified
- Expected completion
- Not verified
Overview
USDOT selected City of Columbus for a $4,664,741 FY 2026 SS4A implementation grant. The project will implement the Fifth Street Corridor Safety Enhancement Project along 5th Street from Main Street to 5th Avenue North and at 6 intersections in downtown Columbus.
Technical scope
The project will implement the Fifth Street Corridor Safety Enhancement Project along 5th Street from Main Street to 5th Avenue North and at 6 intersections in downtown Columbus. The project will install high-visibility crosswalks, countdown pedestrian signals, leading pedestrian intervals, signal visibility upgrades, pavement marking improvements, ADA-compliant sidewalks and ramps, and a new sidewalk between 3rd Avenue North and 5th Avenue North; it will also convert angled parking to parallel parking on part of the corridor and revise lane use on Main Street at 5th Street. The corridor carries about 13,000 vehicles per day, and 2 of the 6 intersections are on the high-injury network. Between 2019 and 2023, the project area experienced 114 crashes, including 1 fatality, 2 suspected serious injury crashes, and 2 vulnerable road user crashes with suspected serious injuries; 41 additional crashes were reported in 2024 and 2025. The project applies FHWA Proven Safety Countermeasures and other evidence-based treatments to reduce speeds, improve visibility, shorten crossing distances, and lower pedestrian and vehicle crash risk corridor-wide. The project includes Planning and Demonstration funds to evaluate traffic calming efforts installed at Main Street and 5th Street in March 2026 and inform final permanent design. The demonstration activities tested traffic operations and public acceptance before concrete construction.
- Project type
- Road safety infrastructure
Contacts
Project contact research is not yet verified. Use the official agency contact route while research is completed.
Use the issuing agency’s designated bidding channel for solicitation questions. Project contacts are not a route around procurement restrictions.
Opportunities & Contracts
No procurement verified
No linked, currently verified solicitation has been established for this project.
Companies Involved
- Recorded organizations
- Lead applicant: City of Columbus; federal grant program: U.S. Department of Transportation, Safe Streets and Roads for All.
Specific roles and award relationships remain subject to source verification.
Budget & Funding
- Reported project value
- $5,830,926 total project cost in the FY 2026 award record; award-time scope and estimate.
- Recorded funding
- $4,664,741 FY 2026 SS4A implementation grant selected by USDOT on October 30, 2026. Grant selection is not proof of obligation, disbursement or a construction contract award.
Project estimates, construction estimates, programmed funding and expenditure are separate figures. None establishes an available contract package.
Timeline & Milestones
- Recorded milestones
- 2026-10-30: FY 2026 SS4A award announced.
Documents & Resources
- USDOT FY 2026 SS4A full award list ↗2026-10-30Applicant, project scope, state, grant type, federal award and total project cost
- USDOT FY26 SS4A award workbook ↗2026-10-30Project: 5th Street Corridor Safety Enhancement Project; applicant: City of Columbus
Updates & Intelligence
Earlier recorded updates
2026-11-08: Added verified applicant, award scope, total project cost, selected federal grant and state from the October 30, 2026 USDOT workbook. Award announced October 30, 2026. This record describes the selected grant scope. Construction progress, contract awards, delivery dates and open procurement have not been established by the award workbook.
Detailed research and a source-backed change history are being assembled. A routine source check is not a material project update.