See what’s next.
Understand the investment priorities, projects and infrastructure decisions shaping the region.
Decide which AI, robotics and reality-capture tools earn a place on the next project.

Understand the investment priorities, projects and infrastructure decisions shaping the region.
Get practical perspectives from public agencies, infrastructure owners and delivery partners.
Make time for conversations with potential clients, collaborators and project partners.
Add your biography, LinkedIn profile, website and related presentations, reports or project links. Infraday reviews submissions and confirms authorization before publishing them.
Sign in or create an Infraday account to submit speaker resources.
Sign in to submit →Request Infraday+ AccessAll times are local to the event. Program subject to change.
Start with a single repeatable task and account for the time that the surveyor, virtual construction team and trade foreperson spend before and after field execution. Compare that baseline with a robot-assisted workflow. The decision turns on rework, safety, waiting and supervision across the crew, including whether a faster task actually releases the next trade earlier.
• Measure labor across the full workflow
• Select a pilot with a meaningful denominator
A robot can reproduce a wrong drawing accurately. Trace a late design change through coordination, approved model, field release and verification on the slab. Compare the designer's responsibilities with the contractor's field controls. Discuss how a trade foreperson identifies the current revision and what happens if an earlier floor marking remains visible.
• Assign ownership of the released layout file
• Define the field check for superseded information
DPR described a field trial of robotic layout with an operator. Use the contractor's account to examine which tasks were timed and which preparation activities sit outside the field measurement. Compare floors with different trade density, model maturity and access. An audience Q&A challenges how a project team could reproduce the comparison on a second site.
• Separate layout speed from total installed cost
• Design an independent repeat trial
Apply a document assistant to a routine submittal question. Trace the cited specification, amendment and drawing back to the contract record and identify the human reviewer authorized to answer. Compare reviewer time saved with the effort required to correct unsupported answers and maintain an audit record that still works when the software supplier changes.
• Define the human approval step
• Choose a sample that measures wrong answers and time
Hardware access, verified field output and labor productivity are different purchases. Compare a daily rental, a service agreement and a performance-based pilot around a measurable task. Discuss data rights, equipment availability, support response and the contractor's duty to provide a safe workplace when the technology supplier controls part of the workflow.
• Select an appropriate payment unit
• Define acceptance and support obligations
Use Caltrans construction survey guidance to frame the difference between a digital surface used to guide work and the survey checks an owner will accept. Follow one earthwork segment through model preparation, independent control and as-built delivery. Discuss who resolves a model discrepancy and which records must remain accessible after the field system leaves the job.
• Separate production guidance from independent verification
• Define the record delivered at acceptance
Choose an inspection workflow in which a captured image or measurement must lead to an owner action. Compare false alarms, missed conditions and the ability to revisit an earlier location. Discuss how the owner validates a finding, retains the record and budgets for review time before claiming that automated capture has reduced inspection cost.
• Define the owner's acceptance sample
• Measure downstream decisions per inspection
Study the planning meeting before a robot arrives on an active floor. Operators, other trades and supervisors need a shared plan for access, temporary stops and reporting a problem. Compare a controlled demonstration with a cluttered shift where conditions change frequently. Discuss training time, worker feedback and the authority to stop or reassign the task.
• Define field stop authority
• Build training and supervision into pilot cost
Compare the first and tenth deployment using utilization, transport, setup, model preparation and crew learning. Discuss how a firm can separate good results on one unusually clean site from a repeatable business case. The owner and contractor perspectives put different values on turnover speed, schedule float and avoided rework.
• Calculate a utilization threshold
• Test payback against repeat-job conditions
Tables choose a layout, inspection or document task and write a trial another project could reproduce. Specify the comparison crew, quality tolerance, reviewer time, operator training and a stopping rule. A skeptical owner challenges the denominator and a trade representative challenges the working conditions before the team recommends a purchase, redesign or end to the trial.
• Prepare a reproducible test protocol
• Set a buy or stop threshold before the trial
Full-day sessions, networking, breakfast, lunch and refreshments. Choose your category to view pricing and complete registration.
Full-day conference access for all attendees.
View registration →Partner profiles, social links and resources will appear as they become available.
Venue to be announced ·
For parking and arrival guidance, contact hello@infraday.com.
Yes. Select your registration type and number of attendees on the registration page and provide each attendee’s name, title, organization and unique email address.
Check your Spam or Junk folder and mark Infraday as a trusted sender. Contact hello@infraday.com if you still need help.
Please review our cancellation and substitution policies before booking.
Profiles will appear as the lineup is confirmed.
2027-06-08 · Mountain View, CA
Register for Infraday Construction AI & Digital Delivery 2027 →Test whether layout, inspection and AI-assisted document work save time across a whole job, then decide whether to use them on the next one.
Infrastructure owners, contractors, specialty trades and technology providers
Venue and arrival details will be posted here when confirmed.
For capital program owners, contractors, surveyors, project controls leads and technology providers. Follow a field measurement into a progress payment or schedule decision. Examine what the crew has to record, what the owner can audit and whether the time or rework saved justifies wider adoption.
Can project controls rely on a machine-generated progress estimate? Compare a scan with quantities accepted in the field, distinguish physical work from approved payment, and decide who can correct the record before costs or forecasts change.
Join private attendee discussions and connect with fellow registrants. Access is reserved for confirmed attendees.
Open attendee community →THE INFRADAY WIRE
The projects, investment, companies and developments moving the infrastructure economy, delivered to your inbox.
Projects. Capital. Policy. Markets.
Free weekly newsletter. Unsubscribe anytime.
The form is taking longer to load. Refresh the page or contact Infraday.