← All eventsINFRADAY · IN PERSON

Infraday Construction AI & Digital Delivery 2027

Decide which AI, robotics and reality-capture tools earn a place on the next project.

2027-06-08
Venue to be announcedVenue website
Apply to speak →
Venue to be announced
THE PROJECTS

See what’s next.

Understand the investment priorities, projects and infrastructure decisions shaping the region.

THE PEOPLE

Hear from the leaders.

Get practical perspectives from public agencies, infrastructure owners and delivery partners.

THE CONNECTIONS

Build relationships.

Make time for conversations with potential clients, collaborators and project partners.

Confirmed speakers: update your bio & resourcesSpeaking at Infraday Construction AI & Digital Delivery 2027? Click to submit your details, links or presentation materials.Open formClose form

Help attendees get to know your work.

Add your biography, LinkedIn profile, website and related presentations, reports or project links. Infraday reviews submissions and confirms authorization before publishing them.

Sign in or create an Infraday account to submit speaker resources.

Sign in to submit →Request Infraday+ Access

On the agenda

All times are local to the event. Program subject to change.

8:45 AM – 9:25 AM
Networking

Registration and breakfast

9:25 AM – 9:35 AM
Welcome

Welcome and program briefing

9:35 AM – 10:05 AM
Owner priorities

Which jobsite problem is expensive enough to automate?

Start with a single repeatable task and account for the time that the surveyor, virtual construction team and trade foreperson spend before and after field execution. Compare that baseline with a robot-assisted workflow. The decision turns on rework, safety, waiting and supervision across the crew, including whether a faster task actually releases the next trade earlier.

• Measure labor across the full workflow
• Select a pilot with a meaningful denominator

10:05 AM – 10:35 AM
Featured conversation

Who owns the layout model that the crew uses tomorrow?

A robot can reproduce a wrong drawing accurately. Trace a late design change through coordination, approved model, field release and verification on the slab. Compare the designer's responsibilities with the contractor's field controls. Discuss how a trade foreperson identifies the current revision and what happens if an earlier floor marking remains visible.

• Assign ownership of the released layout file
• Define the field check for superseded information

10:35 AM – 11:05 AM
Networking

Morning break

11:05 AM – 11:25 AM
Project case study

What DPR and Dusty's layout pilot actually measured

DPR described a field trial of robotic layout with an operator. Use the contractor's account to examine which tasks were timed and which preparation activities sit outside the field measurement. Compare floors with different trade density, model maturity and access. An audience Q&A challenges how a project team could reproduce the comparison on a second site.

• Separate layout speed from total installed cost
• Design an independent repeat trial

11:25 AM – 11:40 AM
Audience Q&A

Questions on the morning case

11:40 AM – 12:10 PM
Panel

Can AI-assisted submittal review stand up to an owner audit?

Apply a document assistant to a routine submittal question. Trace the cited specification, amendment and drawing back to the contract record and identify the human reviewer authorized to answer. Compare reviewer time saved with the effort required to correct unsupported answers and maintain an audit record that still works when the software supplier changes.

• Define the human approval step
• Choose a sample that measures wrong answers and time

12:10 PM – 1:10 PM
Networking

Networking lunch

1:10 PM – 1:40 PM
Panel

What should a public owner buy in its robotics contract?

Hardware access, verified field output and labor productivity are different purchases. Compare a daily rental, a service agreement and a performance-based pilot around a measurable task. Discuss data rights, equipment availability, support response and the contractor's duty to provide a safe workplace when the technology supplier controls part of the workflow.

• Select an appropriate payment unit
• Define acceptance and support obligations

1:40 PM – 2:00 PM
Implementation case study

Machine guidance meets the surveyor's acceptance test

Use Caltrans construction survey guidance to frame the difference between a digital surface used to guide work and the survey checks an owner will accept. Follow one earthwork segment through model preparation, independent control and as-built delivery. Discuss who resolves a model discrepancy and which records must remain accessible after the field system leaves the job.

• Separate production guidance from independent verification
• Define the record delivered at acceptance

2:00 PM – 2:15 PM
Audience Q&A

Questions on the implementation case

2:15 PM – 2:45 PM
Panel

When does inspection automation change a maintenance decision?

Choose an inspection workflow in which a captured image or measurement must lead to an owner action. Compare false alarms, missed conditions and the ability to revisit an earlier location. Discuss how the owner validates a finding, retains the record and budgets for review time before claiming that automated capture has reduced inspection cost.

• Define the owner's acceptance sample
• Measure downstream decisions per inspection

2:45 PM – 3:15 PM
Networking

Afternoon break

3:15 PM – 3:45 PM
Featured conversation

How do crews work alongside a moving machine?

Study the planning meeting before a robot arrives on an active floor. Operators, other trades and supervisors need a shared plan for access, temporary stops and reporting a problem. Compare a controlled demonstration with a cluttered shift where conditions change frequently. Discuss training time, worker feedback and the authority to stop or reassign the task.

• Define field stop authority
• Build training and supervision into pilot cost

3:45 PM – 4:15 PM
Panel

Does a faster floor justify buying a second machine?

Compare the first and tenth deployment using utilization, transport, setup, model preparation and crew learning. Discuss how a firm can separate good results on one unusually clean site from a repeatable business case. The owner and contractor perspectives put different values on turnover speed, schedule float and avoided rework.

• Calculate a utilization threshold
• Test payback against repeat-job conditions

4:15 PM – 4:45 PM
Working session

Design a pilot that can fail honestly

Tables choose a layout, inspection or document task and write a trial another project could reproduce. Specify the comparison crew, quality tolerance, reviewer time, operator training and a stopping rule. A skeptical owner challenges the denominator and a trade representative challenges the working conditions before the team recommends a purchase, redesign or end to the trial.

• Prepare a reproducible test protocol
• Set a buy or stop threshold before the trial

4:45 PM – 5:10 PM
Audience Q&A

Report back and audience questions

5:10 PM – 5:45 PM
Networking

Meet the project teams and continue the discussion

Join us at Infraday

Full-day sessions, networking, breakfast, lunch and refreshments. Choose your category to view pricing and complete registration.

ATTENDEE REGISTRATION

Conference Registration

Full-day conference access for all attendees.

View registration →

Meet your next project partner

Partner profiles, social links and resources will appear as they become available.

Plan your day

Where is the event?

Venue to be announced ·

For parking and arrival guidance, contact hello@infraday.com.

Can I register more than one attendee?

Yes. Select your registration type and number of attendees on the registration page and provide each attendee’s name, title, organization and unique email address.

What if I don’t receive my confirmation?

Check your Spam or Junk folder and mark Infraday as a trusted sender. Contact hello@infraday.com if you still need help.

What are the cancellation and substitution policies?

Please review our cancellation and substitution policies before booking.

The people behind the progress

Speakers to be announced.

Profiles will appear as the lineup is confirmed.

YOUR NEXT INFRASTRUCTURE CONNECTION STARTS HERE

Join the conversation.

2027-06-08 · Mountain View, CA

Register for Infraday Construction AI & Digital Delivery 2027 →
Infraday Construction AI & Digital Delivery 20272027-06-08 · Mountain View, CARegister →

Test whether layout, inspection and AI-assisted document work save time across a whole job, then decide whether to use them on the next one.

Infrastructure owners, contractors, specialty trades and technology providers

Venue and arrival details will be posted here when confirmed.

For capital program owners, contractors, surveyors, project controls leads and technology providers. Follow a field measurement into a progress payment or schedule decision. Examine what the crew has to record, what the owner can audit and whether the time or rework saved justifies wider adoption.

Can project controls rely on a machine-generated progress estimate? Compare a scan with quantities accepted in the field, distinguish physical work from approved payment, and decide who can correct the record before costs or forecasts change.

Download the preliminary agenda (PDF)

YOUR EVENT COMMUNITY

Start connecting before you arrive.

Join private attendee discussions and connect with fellow registrants. Access is reserved for confirmed attendees.

Open attendee community →

THE INFRADAY WIRE

Your weekly infrastructure briefing.

The projects, investment, companies and developments moving the infrastructure economy, delivered to your inbox.

Projects. Capital. Policy. Markets.

Free weekly newsletter. Unsubscribe anytime.

You’re offline. Reconnect to load the latest Infraday updates.