Test factory readiness across industrial water, power, permits, specialty trades and shared off-site infrastructure before releasing the next package.

Understand the investment priorities, projects and infrastructure decisions shaping the region.
Get practical perspectives from public agencies, infrastructure owners and delivery partners.
Make time for conversations with potential clients, collaborators and project partners.
Add your biography, LinkedIn profile, website and related presentations, reports or project links. Infraday reviews submissions and confirms authorization before publishing them.
Sign in or create an Infraday account to submit speaker resources.
Sign in to submit →Request Infraday+ AccessAll times are local to the event. Program subject to change.
Trace a planned fab from the land option to utility service, access and its first tool move. Compare what a development agreement promises with what the water utility, power provider and city can actually deliver. Identify evidence investors can verify at each stage and which commitments should expire if a later manufacturing phase is deferred.
• Separate site control from service readiness
• Identify the public approval on the critical path
Shared water, wastewater and electric facilities can be sized for several phases even if only the first is committed. Discuss how connection fees, guarantees and staged construction allocate the risk of unused capacity. Compare the consequences for existing ratepayers, the manufacturer and neighboring industrial users with different service requirements.
• Allocate the cost of reserve capacity
• Set a trigger for the next utility phase
Phoenix's May 2026 council record describes an interim wastewater solution tied to TSMC's fab construction and the development of industrial reclamation facilities. Trace the difference between temporary service and permanent plant acceptance. Examine who monitors performance, how an interim agreement ends and what happens if the factory and reclamation schedules diverge.
• Identify the termination conditions of interim service
• Assign responsibility for proving permanent capacity
Sensitive manufacturing equipment requires predictable service, but a campus schedule may be firmer than the utility's equipment delivery. Compare the commitments needed for capacity, redundancy, commissioning and operating coordination. Discuss what a developer can put in a site offer before those commitments exist and what the manufacturer needs in writing before ordering tools.
• Separate capacity from quality and availability
• Sequence utility tests before tool installation
A factory shell can look finished while logistics routes, clean utility connections or turnover records remain incomplete. Follow one equipment move from delivery through positioning and acceptance. Identify which responsibilities stay with the manufacturer and which can sit with a contractor when tool schedules change faster than building work can be resequenced.
• Create a tool-ready handoff checklist
• Identify the longest dependency outside the cleanroom
TSMC's Arizona materials describe on-site water recycling and a target for additional recovery. Use the distinction between an operating baseline and a design target to examine what a public utility can count in its long-term plan. Compare intake, reuse, discharge and seasonal demand, then discuss the metering and acceptance evidence each party needs.
• Define the water balance consistently
• Distinguish a design goal from measured performance
Forecasts for an entire campus obscure when particular skills peak. Compare crew demand for specialty piping, electrical installation and commissioning with actual training and supervision capacity. Discuss how owners can sequence packages and how trade partners can commit people across projects without promising the same experienced supervisors to several work fronts.
• Build a trade-specific resource profile
• Identify an actionable training or sequencing change
When specialized equipment slips, a builder can accelerate adjacent work without bringing production forward. Track the consequences through installation, calibration, utilities and customer qualification. Discuss who pays for idle capacity and how the project team identifies work that can progress without risking rework or misleading investors about first production.
• Distinguish physical progress from production readiness
• Agree on an early warning for qualification delay
A large facility can bring infrastructure upgrades while imposing short-term construction demands and long-term service obligations. Compare commitments involving water, road access, workforce or monitoring, with attention to who can measure and enforce each one. Examine how agreements should handle changes of ownership or a deferred second phase without assuming future job counts.
• Select enforceable public commitments
• Define a reporting schedule and responsible party
Teams compare the customer demand forecast, utility milestones and specialty trade capacity for a proposed second phase. A city, manufacturer and lender must each identify a commitment they can make today and one they cannot. Report a conditional release plan, the first irreversible purchase and the conditions that would make postponement the lower-cost decision.
• Set a conditional phase-release decision
• Assign financial exposure for a missed milestone
Full-day sessions, networking, breakfast, lunch and refreshments. Choose your category to view pricing and complete registration.
Full-day conference access for all attendees.
View registration →Partner profiles, social links and resources will appear as they become available.
Venue to be announced ·
For parking and arrival guidance, contact hello@infraday.com.
Yes. Select your registration type and number of attendees on the registration page and provide each attendee’s name, title, organization and unique email address.
Check your Spam or Junk folder and mark Infraday as a trusted sender. Contact hello@infraday.com if you still need help.
Please review our cancellation and substitution policies before booking.
Profiles will appear as the lineup is confirmed.
2027-09-15 · Phoenix, AZ
Register for Infraday Semiconductor & Advanced Manufacturing Infrastructure 2027 →Test factory readiness across industrial water, power, permits, specialty trades and shared off-site infrastructure before releasing the next package.
Manufacturers, economic development teams, utilities, fab developers, equipment suppliers and specialty contractors.
Venue and arrival details will be posted here when confirmed.
Join private attendee discussions and connect with fellow registrants. Access is reserved for confirmed attendees.
Open attendee community →News, projects, capital and opportunities—delivered Wednesdays at noon ET.
Free to subscribe. Unsubscribe anytime.