Rail & Transit · Seadrift, Texas
Watco to use Intramotev’s TugVolt railcars for switching in Seadrift, Texas
Seadrift will be Watco’s second TugVolt site. The battery-electric system already moves soda ash for customers at its Wood River terminal in Illinois.

Watco has agreed to use Intramotev’s battery-electric TugVolt railcars to switch freight cars inside an industrial facility in Seadrift, Texas. The agreement, announced November 20, extends the companies’ work beyond Watco’s Wood River terminal in Illinois, where TugVolt already moves soda ash for customers.
The job in Seadrift is to move cars between tracks within the facility. A TugVolt retrofit gives a freight car its own electric drive, allowing it to move other cars without a separate switching locomotive. The companies have yet to disclose how many units will go to Texas, when they will enter service or what the contract is worth.
How Watco uses TugVolt at Wood River
At Wood River, a worker can stand outside the switching area and use a remote control to position freight cars. Watco describes the unit it piloted there as a converted boxcar. The terminal has 450 railcar storage spaces and room to position 40 cars for handling commodities including soda ash and steel.
Aaron Jensen, Watco’s senior vice president of operations solutions and support, said the Illinois deployment showed the equipment could fit into existing operations. “Bringing it to Seadrift is the next step in putting this technology to work across our network,” Jensen said in the announcement.
Intramotev reports that its technology has moved more than 650,000 tons of material and 9,000 carloads across its deployments. Those figures cover the company’s operations to date. The first operating results from Seadrift will come after service begins.
Infraday has also covered the $16.2 million federal grant for a separate Intramotev rail project in Columbia, Missouri.
Key details
- Seadrift service start
- Date not disclosed
- Wood River railcar storage
- 450 spaces
Why it matters
Watco is extending battery-electric switching to a second industrial site after using the equipment to move soda ash at Wood River.
Watco and Intramotev plan to put TugVolt units to work at the Seadrift facility. The companies have yet to announce when switching will begin.
Review the official next step →