EPA Announces $272 Million Loan for Columbia Water Supply Upgrades
WIFIA financing supports a new raw-water intake, transmission main and treatment improvements serving about 50,000 people.

The Environmental Protection Agency announced a $272 million WIFIA loan on October 2, 2026, for Columbia, Tennessee’s Long-Term Water Supply Program. The work is intended to strengthen drinking-water service for approximately 50,000 people.
The program includes a new raw-water intake, a transmission main and improvements to the existing treatment system. The financing supports the city’s water infrastructure needs; the loan announcement does not identify an open construction bid deadline.
Key details
- Financing: $272 million is the WIFIA loan amount, not a grant or a stated total project budget.
- Scope: Raw-water access, conveyance and treatment improvements.
- Stage: Financing announcement; procurement and construction milestones require separate confirmation.
Next steps
Water-sector contractors and equipment suppliers should verify the owner’s current procurement notices and individual package requirements before preparing bids. Other utilities considering similar financing can review the official WIFIA resources linked from EPA’s announcement, including the current application process and eligibility criteria.
Contacts & resources
EPA announcement and WIFIA resources — October 2, 2026. EPA media inquiries: press@epa.gov; this address is for press questions, not contractor bids.
Details reviewed October 10, 2026. Check linked official updates before acting.
Representative water infrastructure: Silicon Valley Clean Water treatment plant, September 2023; not Columbia’s drinking-water facility. Pi.1415926535 · CC BY-SA 4.0. No editorial alterations; display may be resized or cropped. Display adaptations retain the stated license.